Zed AI works on the same job data.

Get access
ZedOpsProject Managers

Coordinate the job where the data already lives.

Tasks, schedule, issues, logs, documents, and the Zed AI copilot in one place, so you spend less time assembling status and more time clearing blockers.

Project manager reviewing construction schedule
“I am the human API between the site, the owner, and five systems. If one number is wrong, I hear about it in the meeting - not in the tool.”
What project managers tell us, again and again

The PM job when the system is the bottleneck.

Project managers sit between field, office, and material management.

01

Tasks, RFIs, and requests scattered across channels

Task dashboards compete with email and chat.

02

Schedule versus reality

The baseline schedule, the last update, and what the field reported this morning rarely match.

03

Status meetings eat the week

You rebuild the same picture from documents, daily logs, issues, and procurement status, then answer the same questions from owners and subs.

Tools that match a PM’s actual week.

Planning

Schedule and tasks in one execution layer

Plan and view timelines, run task lists with assignments and workflows, and connect that work to project issues, surveys, and work logs, so your schedule is tied to what people actually record.

This week· Marina Heights

To do2

Issue L7 access permit

Due Thu

Confirm crane slot

Due Fri

Doing1

Update 3-week lookahead

Today

Done2

Close RFI-118, sleeves

Waiting on design

Owner progress call

Mon
Quality & safety

Issues, inspections, punch, and incidents

Log issues with follow-up and status, run inspections from templates with actions, manage punch and walkthroughs, and capture safety incidents, linked to the project record your daily logs already use.

Non-conformance reports· Open
NCRItemTradeStatus
NCR-22Fire stopping gap, L4FireClosed
NCR-23Wrong gauge, cable trayElecOpen
NCR-24Duct leakage above limitHVACRetest
NCR-25Missing valve labelsPlumbOpen
Zed AI

Zed AI copilot - insight without inbox archaeology

Insights and summaries on permitted data, report prep, actions where enabled, plus writing assist, same roles as the rest of the app.

Draft this week’s update for the owner

Progress is 64% against 67% planned. The chiller delivery moved to Thursday, which puts L4 testing at risk. Two RFIs are waiting on design.

  • Ductwork L5 complete, ahead by 2 days
  • Chiller delivery slipped 3 days
  • RFI-118 and RFI-121 need design answers

Sources: Schedule, daily logs, RFI register

Information

Documents and daily logs at your fingertips

Organize project files and folders, file daily logs from the top bar with the right project context, and pull PDF reports when stakeholders need a snapshot, without rebuilding from scratch.

Site diary· Level 53 photos
Progress
Riser 2 before insulation
QA
Duct supports, grid C4
Meeting
Coordination walk, east core

Geotagged to the drawing and linked to today’s log

Make every team’s work easier to see.

Walk through the workflows that matter to your role and see how they connect across a project.

Analytics cookies

We use Google Analytics to see which pages are read. It stays off until you agree — see the privacy policy.