Zed AI works on the same job data.

Get access
ZedOpsGeneral Contractors

Run the job on one platform. From logs to ledger.

Projects, field logs, planning, documents, procurement, and quality workflows connected in ZedOps.

General contractor reviewing site plans
“We have a tool for POs, another for daily reports, and spreadsheets for everything else. I spend half my week reconciling them instead of building.”
What GCs tell us, again and again

The cost of a fragmented job record.

General contractors live in ZedOps across projects, field capture, and material management.

01

One job, six systems

Project equipment, materials, work logs, and issues live in different places than your schedule and financial view.

02

Field data never catches the office in time

Daily logs, surveys, and site photos sit in inboxes or paper.

03

Material management and site are out of sync

POs, goods receipt, inventory, and material tracking run on one track; the site runs on another.

How ZedOps matches how you run work.

Projects

Projects, analytics, and execution in one hub

Manage the project record in depth: list or drill into a job, run analytics where enabled, track equipment and materials on the project, log issues and concerns, assign surveys, and tie work logs to activity, without exporting to a second tool.

Issues & concerns· Al Meridian Tower

Open1

Scaffold access, east

Site · Omar K.Med

In progress2

Sleeve clash, L6 riser

MEP · Priya N.High

Revised cable tray route

Elec · Leo T.RFI

Closed1

Level 4 pour signed off

Civil · Sara M.Done
Field

Daily logs the way the field actually works

Per-project daily log workflow from the app chrome, with a project picker when none is selected.

Daily log· Tue 22 SepLive
  • Ahmed R. logged 38 crew on site, 2 visitors

    07:12

  • Priya N. completed ductwork L5 east, 120 m²

    11:40Progress

  • Omar K. flagged rain delay on roof works

    13:05Delay

  • Zed AI drafted the end-of-day summary for review

    17:30

Planning

Planning: estimation, schedule, and tasks

Build estimates against your library and cost structure, plan timelines, and run task boards with assignments and workflows, including exports where your process needs them.

Task board· Week 39
TaskOwnerDueStatus
Chilled water risers L3–L6Ahmed R.MonDone
Fire damper install L5Priya N.WedDone
LV panel terminationsLeo T.ThuNot started
Pressure test, zone BOmar K.FriBlocked
BMS point-to-pointSara M.SatNot started
QHSE

Quality, safety, and closeout

Inspections from templates with daily-log links and action tasks, configurable inspection templates, punch lists and walkthroughs, plus incident reporting, so closeout is not a separate scramble.

Inspection · Plant room B· QA-2043/5 done
  • Pump alignment within toleranceOmar K.
  • Pipe supports at spec spacingOmar K.
  • Valve tags fitted and legibleRaised ISS-460
  • Insulation continuous at jointsOmar K.
  • Drain points accessible

Make every team’s work easier to see.

Walk through the workflows that matter to your role and see how they connect across a project.

Analytics cookies

We use Google Analytics to see which pages are read. It stays off until you agree — see the privacy policy.